by The Design
05 Apr 08:05
591
AW In-situ cal, MAHLI zenith, wheels & Tickalara
112.1 193 818
06 Apr 08:45
592 CM
112.5 193 819
07 Apr 09:25
593 CM
Dr 31m to 31/0006 · el+22m · 06159m · to investigate Kimberley
113.0 193 819
08 Apr 10:04
594 CM
113.5 191 815
09 Apr 10:44
595 M
W
Dr 56m to 31/0222 · el+21m · 06215m · to investigate Kimberley, MAHLI wheels
114.0 192 815
10 Apr 11:23
596
Runout (X-band uplink failure due to too many files on system)
114.4 193 814
11 Apr 12:03
597 CM
W
Dr 28m to 31/0544 · el+20m · 06243m · to investigate Kimberley, MAHLI wheels
114.9 192 814 0.37
12 Apr 12:43
598
Runout (X-band uplink failure due to too many files on system)
115.4 192 812
13 Apr 13:22
599
Runout (X-band uplink failure due to too many files on system)
115.9 191 812
14 Apr 14:02
600
Runout (X-band uplink failure due to too many files on system)
116.3 192 811
15 Apr 14:41
601 CM AW In-situ Liga, MAHLI Speewah, ChemCam window & fiber optic cable, wheels, SAM
116.8 192 808
preconditioning
16 Apr 15:21
602 CM
SAM blank
117.3 192 809
17 Apr 16:00
603 M
Dr 51m to 31/0730 · el+21m · 06294m · to investigate Kimberley
117.8 192 807
18 Apr 16:40
604 CM
118.2 191 804 0.40
19 Apr 17:20
605 C
AW In-situ Lagrange, MAHLI wheels
118.7 191 806
20 Apr 17:59
606 CM
Dr 19m to 31/1100 · el+21m · 06313m · to Windjana
119.2 191 805
21 Apr 18:39
607 C
119.7 191 803 0.35
22 Apr 19:18
608 CM
120.2 191 803
23 Apr 19:58
609 CM
Dr 5m to 31/1262 · el+22m · 06318m · to Windjana
120.6 190 801
Windja
24 Apr 20:38
610 CM
121.1 191 800
na
25 Apr 21:17
611 CM
121.6 190 799 0.36
26 Apr 21:57
612 cm
AB Brush & in-situ Windjana
122.1 191 797
27 Apr 22:36
613
P
MAHLI selfie, drill preload w/MAHLI before & after
122.6 191 798
368 Appendix: Curiosity Activity Summary
Area Noon UTC
Sol RS Arm Activity Summary
Ls
T P Tau
28 Apr 23:16
614 CM
123.1 191 797
29 Apr 23:56
615 Cm
D
MAHLI Windjana brush post-LIBS, mini-drill Windjana w/MAHLI before & after, MAHLI cover 123.5 192 796
open fault
01 May 00:35
616
Runout (MAHLI fault)
124.0 191 795
02 May 01:15
617 CM
MAHLI diagnostics
124.5 192 795 0.35
03 May 01:54
618 CM
MAHLI diagnostics
125.0 191 793
04 May 02:34
619 CM
125.5 193 792
05 May 03:13
620 CM
126.0 192 791
06 May 03:53
621 m
F
Drill Windjana
126.5 192 790
07 May 04:33
622 C
A
APXS Windjana, SAM preconditioning
127.0 192 790
08 May 05:12
623
IS
CHIMRA Windjana, drop to CheMin, CheMin Windjana 1
127.4 192 789
09 May 05:52
624 m
S
Drop to SAM, SAM Windjana 1
127.9 193 790
10 May 06:31
625
CheMin Windjana
128.4 193 789
11 May 07:11
626 CM
128.9 193 787 0.35
12 May 07:51
627 C
AP In-situ Stephen, MAHLI drill hole & tailings, selfie+
129.4 193 787 0.38
13 May 08:30
628 Cm
MAHLI drill hole
129.9 192 788 0.35
14 May 09:10
629
A
In-situ Stephen
130.4 191 787
Drive to 15 May 09:49 630 Cm
Dr 25m to 31/1336 · el+21m · 06342m · toward Mt Sharp, CheMin Windjana 1
130.9 192 784
wa
16 May 10:29
631 M
W
Dr 27m to 31/1478 · el+22m · 06369m · toward Mt Sharp, MAHLI wheels, CheMin Windjana 1
131.4 194 783 0.35
rd
17 May 11:09
632 CM
CheMin Windjana 1
131.9 194 783
Mt Sh
18 May 11:48
633 m
AW In-situ Wift, MAHLI wheels
132.4 193 780 0.43
ar
19 May 12:28
634 m
Dr 69m to 32/0006 · el+25m · 06437m · toward Mt Sharp
132.9 193 780
p with wh 20 May 13:07 635 CM W Dr 75m to 32/0484 · el+25m · 06512m · toward Mt Sharp, MAHLI wheels, Phobos night 133.4 193 780
21 May 13:47
636 Cm
W
Dr 59m to 32/0800 · el+26m · 06572m · toward Mt Sharp, MAHLI wheels
133.9 193 778
eel 22 May 14:26 637 CM W Dr 40m to 32/1026 · el+26m · 06612m · toward Mt Sharp, SAM atmos, MAHLI wheels 134.4 195 779
imag 23 May 15:06 638 C
SAM atmos
134.9 194 778
ing 24 May 15:46 639 C
135.4 194 777 0.33
Dr 1m to 33/0006 · el+26m · 06613m · for MAHLI full wheel 1-4 of 5, Drop to CheMin, CheMin
25 May 16:25
640 CM SW Windjana 2
135.9 194 774
26 May 17:05
641 cM
W
Dr 40m to 33/0040 · el+26m · 06654m · toward Mt Sharp, MAHLI full wheel complete
136.4 194 774
Driv 27 May 17:44 642 C
136.9 195 775
e to
wa
28 May 18:24
643 cM
Dr 85m to 33/0314 · el+22m · 06739m · toward Mt Sharp
137.4 195 775
rd
29 May 19:04
644 m
Dr 104m to 33/0666 · el+25m · 06843m · toward Mt Sharp
137.9 195 774
Mt Sh
30 May 19:43
645 C
138.4 193 772 0.34
ar
31 May 20:23
646 CM
W
Dr 31m to 33/1042 · el+27m · 06874m · toward Mt Sharp, MAHLI wheels
138.9 194 771
p
01 Jun 21:02
647 M
139.4 195 773 0.38
02 Jun 21:42
648 C
139.9 195 776
03 Jun 22:22
649 m
A
Dr 57m to 34/00
06 · el+26m · 06931m · toward Mt Sharp, in-situ Furnace Flats
140.5 196 776
04 Jun 23:01
650 M
SAM getter/scrubber cleanup, Mercury transit
141.0 194 774 0.50
05 Jun 23:41
651 M
Dr 32m to 34/0292 · el+27m · 06963m · toward Mt Sharp with MARDI sidewalk mode test,
141.5 194 776
CheMin Windjana 2
07 Jun 00:20
652 C
SAM preconditioning
142.0 195 779 0.42
08 Jun 01:00
653 m
SW Drop to SAM, SAM Windjana 2, MAHLI wheels & sky
142.5 195 779
09 Jun 01:39
654 Cm
143.0 196 776
10 Jun 02:19
655 cM
Dr 86m to 34/0422 · el+28m · 07048m · toward Mt Sharp
143.5 197 771
11 Jun 02:59
656 Cm
Dr 46m to 34/0780 · el+27m · 07094m · toward Mt Sharp, CheMin Windjana 2
144.0 196 769
Appendix: Curiosity Activity Summary 369
Area Noon UTC
Sol RS Arm Activity Summary
Ls
T P Tau
12 Jun 03:38
657 Cm
Dr 121m to 34/1126 · el+28m · 07215m · toward Mt Sharp
144.6 196 769 0.52
13 Jun 04:18
658 CM
Dr 34m to 35/0006 · el+27m · 07249m · toward Mt Sharp
145.1 196 768
14 Jun 04:57
659 CM
145.6 196 768 0.64
15 Jun 05:37
660 m
W
Dr 1m to 35/0244 · el+27m · 07250m · for MAHLI full wheel, CheMin dark frame, MAHLI REMS
146.1 196 764
UV
16 Jun 06:17
661 m
Dr 138m to 35/0268 · el+26m · 07388m · toward Mt Sharp
146.6 199 763 0.74
17 Jun 06:56
662 cm
Dr 133m to 35/1004 · el+31m · 07521m · toward Mt Sharp, Phobos night
147.2 199 763
18 Jun 07:36
663 CM
Dr 25m to 36/0006 · el+32m · 07546m · toward Mt Sharp
147.7 196 761
19 Jun 08:15
664 CM
Dr 67m to 36/0184 · el+32m · 07613m · toward Mt Sharp
148.2 196 758
20 Jun 08:55
665 cM
Dr 143m to 36/0422 · el+30m · 07755m · toward Mt Sharp
148.7 197 764 0.83
21 Jun 09:34
666 CM
MAHLI CheMin inlet
149.2 197 769
22 Jun 10:14
667 m
W
Dr 1m to 36/1152 · el+30m · 07756m · for MAHLI full wheel
149.8 198 771
23 Jun 10:54
668 cm
Dr 105m to 36/1176 · el+29m · 07862m · toward Mt Sharp
150.3 199 770 0.73
24 Jun 11:33
669 Cm
Dr 39m to 37/0006 · el+33m · 07900m · toward Mt Sharp
150.8 197 772
25 Jun 12:13
670 cm
Dr 107m to 37/0298 · el+31m · 08008m · toward Mt Sharp
151.4 196 778
26 Jun 12:52
671 Cm
Dr 117m to 37/1076 · el+28m · 08124m · toward Mt Sharp
151.9 197 779
Dr 82m to 37/1548 · el+27m · 08206m · toward Mt Sharp, embedding in ripple, exiting landing 27 Jun 13:32
672 CM
ellipse
152.4 196 777 0.69
28 Jun 14:12
673 M
A
In-situ Sourdough, SAM scrubber cleanup
152.9 195 778
29 Jun 14:51
674 m
Dr 5m to 38/0006 · el+27m · 08212m · to back out of ripple after MAHLI Sourdough
153.5 194 779
30 Jun 15:31
675
SAM cleaning activities
154.0 195 782
01 Jul 16:10
676 cM
Dr 16m to 38/0064 · el+27m · 08228m · toward Mt Sharp
154.5 195 780
02 Jul 16:50
677 cM
Dr 20m to 38/0208 · el+28m · 08248m · toward Mt Sharp
155.1 196 776
03 Jul 17:30
678 M
Dr 67m to 38/0344 · el+29m · 08314m · toward Mt Sharp
155.6 198 775
04 Jul 18:09
679 M
W
Dr 1m to 38/0798 · el+29m · 08315m · for MAHLI full wheel
156.1 199 777
05 Jul 18:49
680
Runout (planned for Independence Day holiday)
156.7 199 780
06 Jul 19:28
681
Runout (planned for Independence Day holiday)
157.2 197 782
07 Jul 20:08
682
Runout (planned for Independence Day holiday)
157.8 197 786
08 Jul 20:47
683 m
Dr 52m to 38/0822 · el+30m · 08368m · toward Mt Sharp, sand ripple crossing test, SAM atmos 158.3 197 784
09 Jul 21:27
684
Recharge batteries, SAM getter/scrubber cleanup
158.8 198 781
10 Jul 22:07
685 Cm
Dr 60m to 38/1272 · el+33m · 08428m · toward Mt Sharp, SAM sample reheat
159.4 199 780 0.70
11 Jul 22:46
686 C
Rear Hazcam thermal characterization activity
159.9 198 779
12 Jul 23:26
687 c
A
In-situ Nova, CheMin Windjana 2, MAHLI video of ChemCam plume
160.5 197 781
14 Jul 00:05
688 m
Dr 82m to 39/0006 · el+36m · 08511m · toward Mt Sharp
161.0 197 786
15 Jul 00:45
689 cm
Dr 10m to 39/0450 · el+37m · 08520m · toward Mt Sharp
161.6 198 785
16 Jul 01:25
690 cm
Dr 30m to 39/0522 · el+39m · 08550m · toward Mt Sharp
162.1 198 784
17 Jul 02:04
691 cm
Dr 24m to 39/0732 · el+40m · 08574m · toward Mt Sharp with MARDI sidewalk mode
162.7 198 782
18 Jul 02:44
692 cM
Dr 31m to 39/0930 · el+41m · 08605m · toward Mt Sharp, SAM preconditioning
163.2 199 783
19 Jul 03:23
693
Runout (planned for battery charging)
163.8 198 782
20 Jul 04:03
694 CM
AS In-situ South Park, CheMin Windjana 2, triple drop to SAM
164.3 198 782
21 Jul 04:43
695 m
W
Dr 23m to 39/1182 · el+41m · 08628m · toward Mt Sharp, MAHLI wheels
164.9 198 780
22 Jul 05:22
696 M
A
Dr 20m to 39/1402 · el+43m · 08648m · toward Mt Sharp after in-situ Wildrose, MAHLI Surprise; 165.4 198 784 0.84
RCE maintenance
23 Jul 06:02
697
Runout (RCE-A anomaly)
166.0 200 785
24 Jul 06:41
698
Runout (RCE-A anomaly)
166.5 198 785
25 Jul 07:21
699
Runout (RCE-A anomaly)
167.1 199 787
370 Appendix: Curiosity Activity Summary
Area Noon UTC
Sol RS Arm Activity Summary
Ls
T P Tau
26 Jul 08:00
700 C
CheMi
n sample dump, SAM electrical baseline test
167.6 199 790
27 Jul 08:40
701 Cm
168.2 198 789 0.79
28 Jul 09:20
702 m
Dr 13m to 39/1558 · el+44m · 08661m · toward Mt Sharp, CheMin empty
168.7 198 791
29 Jul 09:59
703 CM
Dr 30m to 39/1672 · el+44m · 08691m · toward Mt Sharp
169.3 200 793
30 Jul 10:39
704 CM AUX Dump sample, CHIMRA clean, in-situ dump pile
169.9 198 795
31 Jul 11:18
705 CM
Dr 5m to 39/1894 · el+44m · 08696m · to targets
170.4 198 796
01 Aug 11:58
706 Cm AW Dr 22m to 40/0006 · el+43m · 08718m · toward Hidden Valley after in-situ Thimble, MAHLI 171.0 199 798
Poleta & wheels
Hidd 02 Aug 12:38 707 CM A In-situ Stirling, MAHLI Mule Spring & goniometry expt 171.6 198 798 0.86
en Va
03 Aug 13:17
708 m
W
Dr 1m to 40/0206 · el+43m · 08719m · for MAHLI full wheel
172.1 198 798
lley
04 Aug 13:57
709 Cm
Dr 14m to 40/0230 · el+42m · 08733m · into Hidden Valley
172.7 200 801
05 Aug 14:36
710 CM
Dr 8m to 40/0372 · el+42m · 08741m · into Hidden Valley, CheMin empty cell, embed in sand
173.3 197 802
06 Aug 15:16
711 Cm
W
Dr 2m to 40/0486 · el+42m · 08743m · back out of Hidden Valley, MAHLI wheels
173.8 198 801
07 Aug 15:56
712 M
174.4 197 799
08 Aug 16:35
713 cM
W
Dr 9m to 40/0546 · el+43m · 08752m · back out of Hidden Valley, MAHLI wheels, Phobos transit 175.0 198 797 0.81
09 Aug 17:15
714 cM
Dr 38m to 40/0666 · el+44m · 08790m · back out of Hidden Valley
175.5 199 797
10 Aug 17:54
715
Runout (planned)
176.1 201 798
11 Aug 18:34
716
Runout (planned)
176.7 199 796
12 Aug 19:13
717 CM
Dr 32m to 40/1006 · el+44m · 08822m · toward Bonanza King
177.3 199 798
13 Aug 19:53
718 Cm
ChemCam cal, CheMin empty cell analysis, SAM electrical baseline test
177.8 198 799 0.72
Bona
14 Aug 20:33
719 Cm
Dr 4m to 40/1292 · el+44m · 08825m · to Bonanza King
178.4 199 800
nza 15 Aug 21:12 720 CM
Engineering maintenance activities
179.0 200 800
Kin
g
16 Aug 21:52
721 CM
179.6 200 800
17 Aug 22:31
722 m
AB Condensed drilling: Brush & in-situ Bonanza King, drill preload w/MAHLI before & after 180.1 200 797
18 Aug 23:11
723
Runout (planned)
180.7 200 799
19 Aug 23:51
724
Condensed drilling: attempt mini-drill, MAHLI before, drill fault
181.3 200 802
21 Aug 00:30
725 CM
181.9 200 802 0.76
22 Aug 01:10
726 CM
D
Condensed drilling: Mini-drill, stone cracked, MAHLI after, MAHLI before of planned full drill site 182.5 199 803