working with an architect:
   creating lasting value in a renovation. In the
    Educate yourself. Learn everything you
   three case histories that follow, you’ll see such
   can about design and construction before
   value because, in each, the homeowners were
   engaging an architect.
   fully engaged in the process, from planning
    Know your budget. A good exercise at any
   through completion.
   time but essential to defining the scope of a
   renovation.
   aFForDing an arCHiteCt
    Be specific. The better you know your
   Many people on a tight budget think they just
   priorities and spatial requirements, the
   can’t afford an architect. Consequently, only 2%
   quicker a design can evolve.
   to 3% of new homes are architect-designed. But
    Get your builder involved early. If you or
   hiring an architect needn’t be an all-or-nothing
   your architect is working with pie-in-the-sky
   proposition. Increasingly, architects are willing to budget numbers, your contractor will bring
   act as consultants for homeowners who want to
   you back to earth. GCs can also spot details
   manage more of a project themselves. And many
   that would be problematic to build.
   architects will reduce their fees if, say, they don’t
    Don’t contract for services you don’t need.
   have to provide as many drawings in the con-
   But first you must learn what those services
   struction set—a workable solution if the builder
   are (see the first point).
   has a decent design sense and can resolve details
    Communicate digitally. Sending emails
   on-site. Whereas a full-service architect’s fees
   or digital photos to your architect is much
   (including site visits) might run 10% to 15% of
   more time- and cost-effective than face-to-face
   the total budget, clients willing to do a lot more
   meetings. Plus, you’ll have a record of what’s
   of the work themselves can often get those fees
   been discussed.
   down to somewhere around 5%.
   Following are paraphrased remarks from Duo
   Dickinson, a Madison, Conn., architect and the
   author of Staying Put: Remodel Your House to Get
   the Home You Want (The Taunton Press, 2011).
   planning Your renovation
   33
   Keeping a ContraCtor on traCK
   change orders handled? This information is far
   more important than an initial bid.
   Dave Carley, a contractor on Bainbridge Island,
   Can i do any of the work to save money?
   Wash., for two decades, did the roof-raising
   Maybe. If you’re hiring a contractor, the best
   remodel on pp. 40–42. The architect and home-
   thing you can do to help control costs is make
   owners of that project raved about Carley, so
   important decisions in a timely manner so the
   here’s his reply to my question, “How do you get
   crew can keep busy. If you do help, it’s still
   the most out of a contractor?”
   important that you stay out of the crew’s way so
   “By being a good customer,” he said with a
   you don’t interrupt their work rhythm. You may
   laugh. “What frustrates contractors the most is
   be able to do some tasks, such as tearing out dry-
   indecisiveness, an inability to move forward, and wall, pulling nails from demolished lumber, or
   disorganization by the homeowner. What con-
   sweeping up at day’s end. But be aware that even
   tractors want to do is move in, do good work, get during demolition, a good crew will be looking
   paid, and go home. . . . We understand that there
   for house conditions that need fixing—such as
   will be change orders and that every job must be
   water damage or insect infestation—so allow the
   somewhat fluid. But what kills project momen-
   crew to concentrate and observe.
   tum and morale more than anything is having to
   stop. Or go backwards in some cases. When you
   Which is better, a fixed-bid or a cost-plus con-
   have to take apart your own work or remodel the tract? Until a builder tears off finished surfaces
   remodel, it’s really tough.
   and has a close look behind the walls, there’s sim-
   “My favorite customers are the ones who
   ply no way to know what he’ll find—and hence,
   come to meetings prepared and are good deci-
   what a renovation will cost. Consequently, even
   sion makers. It allows me to do my job better. If
   fixed bids will contain contingencies (typically
   they have everything chosen, I can do better pric-
   15%) to deal with the unknown. Builders with
   ing, better ordering, better scheduling. And, of
   solid reputations and enough work on their plate
   course, better building.
   often resist fixed-bid situations, however, because
   “These days, most people don’t go through the they feel that such agreements are unfair, set up
   full process with an architect. They get a [mini-
   unrealistic expectations, generate excessive
   mal set of] plans drawn to get them through the
   paperwork, and make for stressful relationships
   city and get a permit and then kind of feel their
   all around. Even careful budgets tend to be a bit
   way through the project. Some people are good
   fluid anyhow. For example, if demo comes in a
   at making decisions and others really struggle. I
   little under budget, you have a cushion if the dry-
   understand their need to contain costs, but good
   waller goes over. In any event, reputable contrac-
   architects prepare the clients, set up realistic
   tors use transparent accounting, regular client
   expectations, and do their homework so their
   meetings, and progress billings based on percent-
   plans are accurate. Which allows me to move for-
   age of completion.
   ward with confidence.”
   Creating Lasting Value:
   taLKing MoneY
   Three Case Histories
   Because we briefly addressed money while dis-
   Although they vary in scope, the following three
   cussing architects’ fees, here are three questions
   renovations are all modest. Each evolved within
   that clients ask contractors all the time. The
   a relatively small footprint, made the most of nat-
   answers are composites from many builders.
   ural light, and created multifunctional areas to
   Why shouldn’t i just go with the lowest bid?
   optimize space and functionality. Each also
   Reputation is a far better indicator of the kind of
   employed a number of green-building principles
   work you’ll get and the kind of experience you’ll
   to conserve resources.
   have. Initial bids are just baby steps when viewed
   in the context of an intimate relationship—this is
   bringing a CraFtSMan
   your home, after all—that will go on for months
   HouSe into a neW CenturY
   and at times be very stressful. In many case
s, com- The two-bedroom bungalow “instantly felt like
   peting contractors are fishing from the same
   home” to Sandra and David. It had beautiful old
   pond: buying materials from the same suppliers,
   windows, wavy glass, unpainted woodwork and
   paying the same hourly rate, and using competi-
   built-in china cabinets in the dining room, and
   tively priced subs. Low bidders sometimes hope to the house had been well cared for. Small by
   recover profit on change orders. So check referrals today’s standards—roughly 1,150 sq. ft.—it had
   carefully. What was the homeowner’s experience?
   comfortably housed a couple and their three kids
   Was the work on time and on budget? How were
   when it was new. Its close quarters would be
   34
   Chapter 2
   Before renovation, the kitchen had few cabinets, almost
   no counter space, a terrible layout, and was impossible to
   keep clean. A full-size refrigerator and stove didn’t help
   the cramped space.
   This 1925 Craftsman bungalow is modest yet commodious, with an oversize, welcoming porch.
   To the east, two small rooms further chopped up the area.
   Built from kits, such cottages provided affordable housing for working-class families.
   A breakfast nook, at right, had been turned into a pantry
   because there was so little room for storage. The table had
   to be moved into the kitchen. The architect started by
   removing the partitions to open up the space.
   something of a challenge because one of the bed-
   rooms would become David’s home office, but
   the couple welcomed the opportunity to get rid of
   The kitchen, before. Architect Fran
   stuff they didn’t need, recycle on a regular basis,
   Halperin’s “before” drawing shows why the
   and live simply.
   kitchen was unworkable: Roughly one-
   The kitchen, however, was a horror: cramped,
   third of the floor space was chopped into
   dingy, and badly out of date. The bathroom was
   two small rooms.
   also dark and a bit funky, but they could live with
   it. The couple lived in the house before starting
   their renovation, but when they did, they had an
   ace in the hole. David’s cousin, Fran, was an
   architect who loved a challenge.
   Program requirements: “A kitchen you can use
   without bumping into stuff! More storage, more
   counters, more room. It’s impossible to keep
   clean, and the old linoleum is shot. The bath-
   room is dark; it would be nice for both of us to
   have our own space in it. We rarely use the tub.”
   kitchen solutions: “Take out the walls and open
   The kitchen, after.
   it up” to create one large kitchen space. Create a
   With the space
   large island whose concrete countertop includes
   opened up and a
   a cooktop, prep areas, and places to eat and hang
   multifunctional
   out. Replace the full-size fridge (17 cu. ft.) with a
   island devised to
   European (9 cu. ft.) model. Upgrade the sink, and
   optimize space, the
   kitchen now has
   replace the glass in the over-sink window with
   breathing room.
   obscure glass to increase privacy. Replace the old
   linoleum with Marmoleum®. Add a desk in the
   kitchen for Sandra next to the east window.
   planning Your renovation
   35
   With natural light from three directions, the renovated kitchen is bright, airy, and easy to navigate. A cheerful corner creates a temporary office for Sandra, a An island with a colorful concrete top conserves space by combining functions: It serves as a
   therapist. Lower cabinet drawers are large enough for files,
   cooking and prep area and, with room for three tall chairs, an intimate eating area.
   while drawer-pull shapes echo accent tiles on the wall.
   Bathroom solutions: Replace the old, encased
   tub with a glassed-in shower stall (see the top
   photo on the facing page). Instead of installing a
   second window on the south wall, install a light
   tube over the shower at a fraction of the cost—
   and greater privacy. Tile floors with radiant heat-
   ing. In the small space next to the shower, add a
   stand-up beauty area just for Sandra—David
   can have the medicine cabinet over the sink for
   his stuff.
   Green touches: The California cooler in the
   north wall keeps produce cool naturally, so the
   refrigerator can be smaller: Shop often, eat fresh.
   David, a rocket scientist, was
   Marmoleum flooring. The light tube is free lighting.
   intrigued by the simple efficiency
   of the traditional California cooler
   Parting thoughts [Sandra]: “It’s such a gift to be
   built into the north wall of the
   able to work with an architect. . . . What I
   kitchen, so he improved upon it.
   remember most from the renovation was the
   He insulated its door and added a
   enormous joy of seeing what you thought it was
   pair of thermometers so he can
   going to look like turn out even better. And to
   monitor his attempts to optimize
   its performance.
   have the space transformed was like magic upon
   magic. . . . The island is our favorite place for
   meals. David and I often sit side by side and hold
   hands as we eat; it’s very intimate.”
   A playful cutout provides privacy for a kitty loo.
   Project size: 230 sq. ft., kitchen and bath
   Marmoleum flooring’s wide range of colors allowed
   Architect: Fran Halperin, San Rafael, Calif.,
   the designer to duplicate the pattern of a parquet border
   www.halperinandchrist.com
   in the adjacent dining room. Craftsman houses often
   interior design: Sharon Low, San Francisco,
   repeat architectural patterns in floors, cabinets, windows,
   Calif., [email protected]
   and doors.
   Construction: Eric Christ, Noah Garber,
   www.halperinandchrist.com
   Completed: 2009
   36
   Chapter 2
   interior Design: mAkinG it All Work
   Interior designer Sharon Low and architect Fran Halperin often collaborate
   because their skills mesh so nicely. Says Fran, “Sharon is able to pull all the
   pieces together. Architects aren’t really into all those tiny little details, the
   pulls, the towel bars. You have to be a born shopper to be able to find all that
   stuff. She’s a hunter-gatherer.”
   Says Sharon, “Fran’s a 3-D person, I’m more 2-D. I understand how colors and
   surfaces and textures work. And I’m a pretty good diplomat. If I am working
   with couples whose color choices are on totally opposite ends of the scale, I
   can somehow come up with a palette that pleases them both so they can
   choose their battles about something else. I like to say that I’m sort of a color
   therapist; there’s probably about 20% design and 80% therapy in each project.
   Often I throw in something so completely different that it rocks them off their
   boats and really gets them talking to each other.”
<
br />   A glassed-in shower stall with a light tube upgraded a dark bathroom with
   a tired tub. To the right of the shower is a stand-up makeup counter with
   plenty of drawers underneath. Again, elegant details make the small space
   feel special: A pomegranate-seed motif in the tiles repeats in the drawer
   pulls and in a custom tile design on the radiant-heated floor.
   a MuLtiFaCeteD jeWeL
   in a SYLvan Setting
   At first glance, the space beneath the garage was a
   daunting place to add an in-law suite. It was dark,
   steeply pitched, and—perched on one of San
   Francisco’s foggier hillsides—damp almost
   300 days a year. Structurally, the rehab was sure
   to be complex as well. So by the time the owners,
   Nayaran and Melanie, met with Stephen Shoup of
   buildingLab, they’d spent a lot of time pondering a
   renovation and had as many questions as answers.
   Initially, the suite would house an au pair, but
   someday one of their parents would probably
   move in. So it needed to be a self-contained living
   space. Aesthetically, the suite should match the
   main house. For budgetary reasons, it must be
   built entirely within the footprint of the garage,
   490 sq. ft. And because both clients were busy,
   they needed to simplify decision making and lines
   of responsibility. They wanted just one entity,
   buildingLab, to handle all aspects of the job—
   whether wrangling with the city, refining the
   design, or explaining the technical implications
   of a choice.
   Program requirements: Create an in-law suite
   from the raw space under the garage. Tie the new
   A garage above, an in-law below. Cut
   unit to the main house by incorporating similar
   into a steep hillside, the unused space
   materials, proportions, and aesthetics. Although
   beneath the garage was a natural for
   Before. Seen from the house walkway, the garage sits
   an in-law suite—if some formidable
   it will initially accommodate a nanny, it may
   against a steeply sloping hill. The bottom of the window is structural challenges could be met
   someday house an elder parent. Although the unit the same level as the garage floor, so most of the structure and an ingenious floor plan could be should be autonomous, it need not be slavishly so was unused space.
   devised.
   planning Your renovation