  To complicate matters, all the services regarded the counterinsurgency wars in Iraq and Afghanistan as unwelcome military aberrations, the kind of conflict we would never fight again—just the way they felt after Vietnam. The services all wanted to get back to training and equipping our forces for the kinds of conflict in the future they had always planned for: for the Army, conventional force-on-force conflicts against nation-states with large ground formations; for the Marine Corps, a light, mobile force operating from ships and focused on amphibious operations; for the Navy, conventional maritime operations on the high seas centered on aircraft carriers; for the Air Force, high-tech air-to-air combat and strategic bombing against major nation-states.

  I agreed with the need to be prepared for those kinds of conflicts. But I was convinced that they were far less likely to occur than messy, smaller, unconventional military endeavors. I was also convinced, based on history and experience, that we were utterly unable to predict what kinds of future conflicts we would face. In fact, after Vietnam, when we used our military—in Grenada, Lebanon, Libya (twice), Panama, Haiti, the Balkans, and elsewhere—it was usually in relatively small-scale but messy combat. The one time we used large conventional formations with limited objectives—against Iraq to liberate Kuwait in 1991—the war ended in one hundred hours. The war in Afghanistan, from its beginning in 2001, was not a conventional conflict, and the second war against Iraq began with a fast-moving conventional offensive that soon deteriorated into a stability, reconstruction, and counterinsurgency campaign—the dreaded “nation-building” that the Bush administration took office swearing to avoid. In not one of those conflicts had we predicted even six months beforehand that we would be militarily engaged in those places. I felt strongly that we had to prepare our forces in the future, both in training and in equipment, to fight all along the spectrum of conflict, from counterterrorism to taking on well-armed nonstate groups (such as the terrorist group Hizballah) to fighting conventional nation-states. Developing this broad range of capabilities meant taking some time and resources away from preparations for the high-end future missions the military services preferred. I would take on that fight in mid-2008, but in 2007 and early 2008, my focus was on getting the troops in Iraq and Afghanistan the equipment and support they needed.

  MINE-RESISTANT, AMBUSH-PROTECTED VEHICLES

  On April 19, 2007, while on an official visit to Israel, I noticed in the Pentagon’s daily press summary, “The Early Bird,” an article by Tom Vanden Brook in USA Today that began, “In more than 300 attacks since last year, no Marines have died while riding in new fortified armored vehicles the Pentagon hopes to rush to Iraq in greater numbers this year, a top Marine commander in Anbar province said.” The article described the vehicles’ raised, V-shaped hulls that deflected the force of blasts from homemade bombs buried in roadways—improvised explosive devices (IEDs). It quoted Marine Brigadier General John Allen, deputy commander of coalition forces in Anbar, as saying there had been eleven hundred attacks on these vehicles in the preceding fifteen months, with an average of less than one injured Marine per attack. I flew on to Iraq that afternoon for twenty-four hours for the key meeting with David Petraeus about troop drawdowns in the fall, returned home for thirty-six hours, and then, on the twenty-second, began a trip to Russia, Poland, and Germany. But I continued to think about this new kind of vehicle and asked for a briefing on it once I was back in Washington.

  IEDs had been a problem in Iraq from the early days of the war. As time went by, the bombs became bigger and the insurgents more clever in how they planted, hid, and detonated them. By the end of 2006, the number of IEDs deployed by our enemies in Iraq accounted for up to 80 percent of soldier casualties. To make matters worse, Iran was providing its surrogates in Iraq with “explosively formed projectiles,” a fairly sophisticated warhead that, when fired, in essence became a molten metal slug capable of penetrating the armor of our heaviest vehicles, including the Abrams tank. To develop countermeasures against IEDs and get solutions, and training, to the field quickly, the Army created a task force that changed form several times, but ultimately, in February 2006, at Secretary Rumsfeld’s direction, it became the inelegantly named but critically important Joint Improvised Explosive Device Defeat Organization. It received billions of dollars to develop surveillance and jamming systems to defeat the IED bomb-building networks and to detect and disable IEDs before they exploded. The organization was an early example of a secretary and deputy secretary of defense concluding they had to go outside the normal bureaucratic structure to get a critical combat task accomplished.

  Despite these efforts, more and more of our troops were being burned, maimed, and killed by IEDs, many of them in Humvees. Humvees could be reinforced with armor on the sides, but there were few practical options left to further armor the underbelly of the vehicle. Soldiers were reduced to putting sandbags on the floors of the Humvees to try to protect themselves. It didn’t help much. Too many Humvees became funeral pyres for our troops, and I would see some of the surviving victims at the burn unit at Brooke Army Medical Center in San Antonio. Over time more and more side armor was attached to the Humvees, as additional protection from attacks by rockets, grenades, and other weapons, but it still provided little or no protection from bombs that blew up under the vehicles.

  I received my first briefing on the mine-resistant, ambush-protected (MRAP) vehicle I had read about in USA Today on April 27, 2007. The secretary of defense’s conference room is not a big one by Washington (and Pentagon) standards, and it is quite plain, which suited me fine. I always tried to set an informal atmosphere so people would be more inclined to speak up; I don’t think I ever wore a suit jacket to a meeting of Defense officials in that room. The table seats about twenty, with another twelve or so chairs lining the wall. There is a screen for the omnipresent Power-Point slides, and combat photographs line the walls—including one of Doug Zembiec, “the Lion of Fallujah,” whose story had caused me to choke up publicly at the Marine Corps Association annual dinner. There was also a coffee cart, essential to my alertness and my self-discipline—for some reason, a coffee cup in my hand made it easier for me not to fly off the handle in briefings that were often frustrating and maddening. There was always a behind-the-scenes battle involving myriad people pushing and shoving to be in meetings I held, and it fell to my two senior assistants to decide who could or could not attend. I guess people felt they needed to be there to demonstrate to others that they were “on the inside” on issues or to protect their sector’s equities. Unfortunately, those in the room rarely gave me the background details—especially about bureaucratic infighting—on the matter at hand that would have helped me understand how the problem had ended up on my desk.

  So it was with MRAPs. I learned the background story the same way I heard about the vehicle in the first place: from the newspaper. Two and a half months after my first briefing, I read in USA Today that the Pentagon had first tested MRAPs in 2000 and that the Marine Corps had requested its first twenty-seven of them in December 2003 for explosive disposal teams. At the end of 2004, the Army had solicited ideas for a better armored vehicle—to sell to the Iraqis, not for U.S. use. The first of those vehicles, nearly identical to MRAPs, were delivered to the Iraqis at the end of summer 2006. Meanwhile, in February 2005, Marine Brigadier General Dennis Hejlik in Anbar province signed a request for more than a thousand of the same kind of vehicles for his men. According to the newspaper, Hejlik’s request was shelved; fifteen months later, a second request won Pentagon approval. The first vehicles arrived in Anbar in February 2007, two years after the original request.

  Multiple explanations have been put forward for the delay in getting MRAPs into Iraq. The most significant is that no one at a senior level wanted to spend the money to buy them. The services did not want to spend procurement dollars on a vehicle that was not the planned long-term Army and Marine Corps replacement for the Humvee—the joint light tactical vehicle. Most people believed the MRAPs wou
ld just be surplus after the war, which most also thought would soon end. Some argued that the threat from IEDs was evolving, and that only in 2006 had our troops begun encountering the explosively formed projectiles (EFPs) that could cut through our heaviest armor. Others contended that only in 2006 had road-implanted bombs become the primary threat, which ignores the fact that in the summer of 2004 more than 1,000 IEDs exploded in Sadr City alone, and another 1,200 were dug up. Procurement of the heavy MRAP vehicles may also have been delayed because they were seen to be contrary to Secretary Rumsfeld’s goal of lighter, more agile forces. There were doubts whether industry could produce MRAPs in numbers and on a schedule that would meet the need. Finally, most opposed acquiring MRAPs simply because they thought the vehicles were a waste of money; the enemy would just build bigger IEDs.

  Whatever the reason, there were hardly any MRAPs in Iraq when I was briefed in April 2007. But I knew damn well that our troops were being burned and blown up in Humvees well before I became secretary and that had they been in MRAPs, many soldiers would have escaped injury or death.

  My briefer at that April 27 meeting was the assistant commandant of the Marine Corps, General Bob Magnus. (The Marine Corps had taken the lead in developing MRAPs.) In November 2006, the Corps had solicited proposals for an armored vehicle that could protect against roadside bombs, and in January 2007 it had awarded nine companies contracts to develop prototypes. Magnus explained the importance of the vehicles and said that 3,700 were on order for the Marine Corps and 2,300 for the Army, but that there was no money available to pay for them. Only 1,300 were to be built by the contractor in 2007. Business as usual.

  On May 2, I met with the secretaries of the Army and Navy, Deputy Secretary England, Pace, and others on the need to dramatically increase the funding, size, and speed of MRAP procurement. I didn’t often get passionate in meetings, but in this one I laid down a marker I would use again and again concerning MRAPs: “Every delay of a single day costs one or more of our kids his limbs or his life.” To my chagrin, not a single senior official, civilian or military, supported my proposal for a crash program to buy thousands of these vehicles. Despite the lack of support, the same day I issued a directive that made the MRAP program the highest-priority Department of Defense acquisition program and ordered that “any and all options to accelerate the production and fielding of this capability to the theater should be identified, assessed, and applied where feasible.” This directive began an all-out push to produce MRAPs, an effort that would become the first major military procurement program to go from decision to full industrial production in less than a year since World War II.

  Congress was fully supportive of the project. More than a month before my decision, Senator Joseph Biden on March 28 had offered an amendment, which passed 98–0 in the Senate, providing an additional $1.5 billion for MRAPs and pulling forward money from the FY2008 budget into 2007. At the end of April, Congress approved $3 billion to buy MRAPs during the following six months, and a House Armed Services subcommittee added another $4 billion for FY2008. Congress gave us every cent we requested. Indeed, given how large the MRAP procurement would eventually become, without congressional willingness to add money to the war funding bills for the vehicles, they would never have been built—at least not in the numbers we bought. Without this support from Congress, funding for the MRAPs would have had to come out of the military services’ regular budgets, which would have caused a bureaucratic and political bloodbath. Congress’s habitual lack of fiscal discipline in this instance was a blessing.

  On Saturday, May 19, at Aberdeen Proving Ground in Maryland, I saw these huge new vehicles for myself. There were a number of different models from different manufacturers being tested. I watched in awe as a test model was blown up by a large IED and the passenger compartment remained intact. The soldiers inside would have survived. The experts at Aberdeen were identifying the weaknesses and strengths of the different models to inform the program managers, who would decide what to buy, and also to give feedback to the manufacturers about their vehicles. I had nothing to contribute except to reiterate my now-familiar exhortation: “Hurry up! Troops are dying.”

  At the end of May, I approved putting the MRAP program in a special, very small category of Defense procurement, effectively setting aside many bureaucratic hurdles typical of military programs. It gave the MRAP program legal priority over other military and civilian industrial production programs for key components such as specialty steel, tires, and axles. I also directed establishment of a department-wide MRAP task force and asked to be briefed every two weeks. I emphasized that getting MRAPs to Iraq as fast as possible was essential and that everyone needed to understand that speed and multiple models meant we would face problems with spare parts, maintenance, training, and more. I said we would deal with those problems as they arose and that we should be candid with the president and with Congress that those potential problems were risks we were prepared to take to get better protection to the troops faster. We also reminded everyone that the MRAP wasn’t immune to successful attack and the enemy would adapt his techniques to the new vehicle. But it would provide better protection than anything else we had.

  The magnitude of the challenge became clear at my first meeting with the task force on June 8. The initial approved requirement for MRAPs of all models at that point was 7,774 vehicles. In just a matter of a couple of weeks, though, the total proposed requirement had skyrocketed to 23,044 at a cost of a little over $25 billion—I think because the field commanders quickly recognized the value of the MRAP and realized that the vehicles were actually going to get built. But how to produce the huge quantities of critically needed materials for the vehicles, from specialty ballistic steel to tires? How to get the MRAPs to Iraq? Where to base them? How to maintain them? It fell to the task force led by the director of defense research and engineering (and soon to be undersecretary for acquisition, technology, and logistics), John Young, to find the answers to these questions, and find them they did.

  On a trip to the Middle East in late summer 2007, I experienced a gut-wrenching validation of the need for MRAPs. While visiting Camp Arifjan in Kuwait, a gigantic logistics center supporting the war effort in Iraq, toward dusk, I was taken to the “boneyard”—an area covering many acres that contained the wrecked remains of thousands of American tanks, trucks, Humvees, and other vehicles. Nearly all had been destroyed by enemy attacks in Iraq. I separated myself a bit from the group and wandered through the endless sandy rows of equipment, each vehicle bearing witness to the suffering and losses of our troops. I imagined their screams and their shattered bodies. As I departed, I knew it was too late to help them, but by God, I would move heaven and earth to try to save the lives of their comrades.

  Ultimately, we would buy some 27,000 MRAPs, including thousands of a new all-terrain version for Afghanistan, at a total cost of nearly $40 billion. The investment saved countless lives and limbs. Over time, casualty rates in MRAPs were roughly 75 percent lower than they were in Humvees, and less than half those in Abrams tanks, Bradley fighting vehicles, and Stryker armored vehicles. And there would continue to be improvements. For example, underbelly blasts had such upward force that too often soldiers in MRAPs would suffer badly broken legs and fractured pelvises, so the flooring and seats were redesigned.

  On January 18, 2008, I visited the Space and Naval Warfare Systems Center in Charleston, South Carolina, where MRAPs received a final fitting out before being shipped to Iraq. I toured the factory and talked to the workers, many of them veterans themselves. These men and women were skilled salt-of-the-earth patriots who were passionate about what they were doing. Each of those I talked with knew that the vehicle he or she was working on would very likely save the lives of our soldiers. One of them, a bearded, heavyset fellow in jeans and a plaid shirt, invited me to sit in the driver’s seat of the MRAP he was just finishing. He reached into the glove compartment and brought out a laminated card that would accompany the vehicle to Iraq. It
had the signatures of the team that had worked on that vehicle. He said they knew lives depended on the quality of their work, and they wanted the soldiers riding in that vehicle to know that each member of that team took personal responsibility for that specific MRAP. He said such a card went with every MRAP.

  Beginning in late 2007, every time I visited Iraq, units were proud to show me their MRAPs. Unit commanders especially loved them as they saw their soldiers walk away from attacks that previously would have been fatal. I learned from soldiers that the ride was very uncomfortable, that the vehicles were so heavy (the weight ranged from roughly fourteen tons to nearly thirty tons, depending on the model) that they were not very useful off-road, and that rollovers were a real risk. They were so tall that, when going through towns, the antennas could snag electric wires. Our ingenious troops simply improvised, using long pieces of plastic pipe to lift the electric wires as they went under. Others jerry-rigged ambulances out of MRAPs, and one brigade commander had a desk put in one to use as a mobile command post. But mostly they just delivered soldiers from one place to another with far greater safety than they previously had. Time and again, commanders would walk me over to a damaged MRAP, and there would be two or three soldiers standing by it who would tell me about surviving an attack on that vehicle. A journalist passed along to me the story of a colonel watching a live video feed showing one of his unit’s vehicles overturned and in flames after an IED attack and praying out loud, “Please, just save one of my guys.” And then he watched, astonished, as all three men inside emerged injured but alive. They had been in an MRAP.

 