“So, now it’s your turn,” he says sternly, poking a finger into my chest. “You’ve got to figure out how to decrease your changeover time and enable faster deployment cycle time.
“I think your target should be…” he says, pausing for a moment. “Ten deploys a day. Why not?”
My jaw drops. “That’s impossible.”
“Oh, really?” he says, deadpan. “Let me tell you a story. Back in 2009, I was a board director at a technology company, where one of our engineers went to the Velocity Conference and came back raving like a madman, full of dangerous, impossible ideas. He saw a presentation given by John Allspaw and his colleague Paul Hammond that flipped the world on its head. Allspaw and Hammond ran the it Operations and Engineering groups at Flickr. Instead of fighting like cats and dogs, they talked about how they were working together to routinely do ten deploys a day! This is in a world when most it organizations were mostly doing quarterly or annual deployments. Imagine that. He was doing deploys at a rate one thousand times faster than the previous state of the art.
“Let me tell you,” he continues, “we all thought that this engineer had lost his marbles. But I learned that the practices that Allspaw and Hammond espoused are the inevitable outcome of applying the Three Ways to the it value stream. It totally changed how we managed it and it saved our company.
“How did they do it?” I ask, dumbfounded.
“Good question,” he replies. “Allspaw taught us that Dev and Ops working together, along with qa and the business, are a super-tribe that can achieve amazing things. They also knew that until code is in production, no value is actually being generated, because it’s merely wip stuck in the system. He kept reducing the batch size, enabling fast feature flow. In part, he did this by ensuring environments were always available when they were needed. He automated the build and deployment process, recognizing that infrastructure could be treated as code, just like the application that Development ships. That enabled him to create a one-step environment creation and deploy procedure, just like we figured out a way to do one-step painting and curing.
“So, we now know that Allspaw and Hammond weren’t so crazy after all. Jez Humble and Dave Farley independently came to the same conclusions, and then codified the practices and principles that enable multiple deployments per day in their seminal book Continuous Delivery. Eric Ries then showed us how this capability can help the business learn and win in his Lean Startup work.”
As Erik talks, he is as animated as I’ve ever seen him. Shaking his head, he looks sternly at me.
“Your next step should be obvious by now, grasshopper. In order for you to keep up with customer demand, which includes your upstream comrades in Development,” he says, “you need to create what Humble and Farley called a deployment pipeline. That’s your entire value stream from code check-in to production. That’s not an art. That’s production. You need to get everything in version control. Everything. Not just the code, but everything required to build the environment. Then you need to automate the entire environment creation process. You need a deployment pipeline where you can create test and production environments, and then deploy code into them, entirely on-demand. That’s how you reduce your setup times and eliminate errors, so you can finally match whatever rate of change Development sets the tempo at.”
“Hold on,” I say. “What is it exactly that I’m supposed to automate?”
Erik looks at me sternly. “Go ask Brent. Get him assigned to that new team, and make sure that he doesn’t get distracted. Now more than ever, until you get your build process automated, he is your bottleneck. Get the things that are in his head encoded into the build procedures. Get humans out of the deployment business. Figure out how to get to ten deploys a day.”
I can’t get over my skepticism. “Ten deploys a day? I’m pretty sure that no one is asking for that. Aren’t you setting a target that’s higher than what the business needs?”
Erik sighs, rolling his eyes. “Stop focusing on the deployment target rate. Business agility is not just about raw speed. It’s about how good you are at detecting and responding to changes in the market and being able to take larger and more calculated risks. It’s about continual experimentation, like Scott Cook did at Intuit, where they did over forty experiments during the peak tax filing season to figure out how to maximize customer conversion rates. During the peak tax filing season!
“If you can’t out-experiment and beat your competitors in time to market and agility, you are sunk. Features are always a gamble. If you’re lucky, ten percent will get the desired benefits. So the faster you can get those features to market and test them, the better off you’ll be. Incidentally, you also pay back the business faster for the use of capital, which means the business starts making money faster, too.
“Steve is betting his entire survival on your ability to execute and deploy capabilities faster. So, get to work with Chris to figure out how at every stage of the agile development process, you not only have shippable code, but a working environment it can deploy into!”
“Okay, okay,” I say. “But why did you drag me all the way over here in the freezing cold? Wouldn’t explaining it on a whiteboard have been enough?”
“You think it Operations is rocket-science compared to manufacturing. What absolute baloney,” he says dismissively. “From where I’m sitting, the people in this building have been far more creative and courageous than anything I’ve seen come from you it guys so far.”
CHAPTER 31
• Monday, November 3
It’s 12:13 p.m. when I walk into the swat team kick-off meeting. My hair is dripping wet and my shirt is soaked from my ride back in Erik’s convertible. Chris is talking. “—and so Steve has authorized this small team to deliver the promotion functionality and do whatever it takes to make a positive impact on the holiday shopping season.”
Chris turns to me and points to the back of the room. “I went ahead and ordered lunch for everyone to kick this off. Go ahead and—what happened to you?”
I wave away his question. Looking at where he’s pointing, I’m pleasantly surprised to see a turkey sandwich lunch box still at the back. Grabbing it, I take a seat and try to gauge the temperature of everyone in the room, especially Brent.
Brent responds, “Explain again why I’m here?”
“That’s what we’re here to figure out,” Wes says earnestly. “You know as much as we do. One of the potential board members insisted that you be a part of this team. Quite frankly, he’s been right enough times that I trust him, even if I have no freaking idea why.”
Patty chimes in. “Well, he gave us a couple of clues. He said that the problems we need to focus on are the deployment process and the way we’re building the environments. He seems to think we must be doing something fundamentally wrong because of all the chaos resulting from each Phoenix deployment.”
As I unwrap my sandwich I say, “I just came back from a meeting with him. He showed me a bunch of stuff and explained how they do single-minute exchanges of die at Toyota. He thinks we need to build the capability to do ten deploys per day. He not only insists this is possible but also that it supports the feature deployment cycles the business needs, not just to survive, but to win in the marketplace.”
Surprisingly, Chris speaks out the most fiercely. “What? Why in the world would we need to do ten deploys a day? Our sprint intervals are three weeks long. We don’t have anything to deploy ten times a day!”
Patty shakes her head. “Are you sure? What about bug fixes? What about performance enhancements when the site grinds to a halt, like what’s happened during the last two major launches? Wouldn’t you love to do these types of changes in production routinely, without having to break all the rules to do some sort of emergency change?”
Chris thinks for a couple of moments before responding. “Interesting. I would normally call those types of fixes a patch or a minor release. But you’re right—those are deployments, too. It would be great if we could
roll out fixes more quickly, but come on, ten deploys a day?”
Thinking about what Erik said, I add, “How about enabling Marketing to make their own changes to content or business rules or enabling faster experimentation and a/b split testing, to see what offers work best?”
Wes puts both of his hands on the table. “Mark my words, folks. It can’t be done. We’re dealing with the laws of physics here. Forget about how long it currently takes, which requires over one week of preparation and over eight hours to do the actual deployment! You can only put bits down on the disk so fast.”
That’s exactly what I would have said before the plant tour with Erik. I say earnestly, “Look, maybe you’re right, but humor me for a second: Just how many steps are there in the entire end-to-end deployment process? Are we talking about twenty steps, two hundred, or two thousand?”
Wes scratches his head for a moment before he says, “What do you think, Brent? I would have thought about a hundred steps…”
“Really?” Brent responds. “I would have thought it was more like twenty steps.”
William interjects, “I’m not sure where you’re starting to count, but if we begin at the point where Development commits code and we label it as a ‘release candidate,’ I can probably come up with a hundred steps, even before we hand it to it Operations.”
Uh-oh.
Wes interrupts, “No, no, no. Bill said ‘deployment steps.’ Let’s not open up a can of—”
As Wes talks, I think about Erik challenging me to think like a plant manager as opposed to a work center supervisor. I suddenly realize that he probably meant that I needed to span the departmental boundaries of Development and it Operations.
“You guys are both correct,” I say, interrupting Wes and William. “William, would you mind writing down all the steps on the whiteboard? I’d suggest starting at ‘code committed,’ and keep going until the handoff to our group.”
He nods and walks to the whiteboard and starts drawing boxes, discussing the steps as he goes. Over the next ten minutes, he proves that there are likely over one hundred steps, including the automated tests run in the Dev environment, creating a qa environment that matches Dev, deploying code into it, running all the tests, deploying and migrating into a fresh staging environment that matches qa, load testing, and finally the baton being passed to it Operations.
When William is finished, there are thirty boxes on the board.
Looking over at Wes, I see that rather than looking irritated, he actually appears deep in thought, rubbing his chin while looking at the diagram.
I indicate to Brent and Wes that one of them should continue where William left off.
Brent gets up and starts drawing boxes to indicate the packaging of the code for deployment; preparing new server instances; loading and configuring the operating system, databases, and applications; making all the changes to the networks, firewalls, and load balancers; and then testing to make sure the deployment completed successfully.
I contemplate the entirety of the diagram, which surprisingly reminds me of the plant floor. Each of these steps is like a work center, each with different machines, men, methods, and measures. it work is probably much more complex than manufacturing work. Not only is the work invisible, making it more difficult to track, but there are far more things that could go wrong.
Countless configurations need to be set correctly, systems need enough memory, all the files need to be put in the right place, and all code and the entire environment need to be operating correctly.
Even one small mistake could take everything down. Surely this meant that we needed even more rigor and discipline and planning than in manufacturing.
I can’t wait to tell Erik this.
Realizing the importance and enormity of the challenge in front of us, I walk to the whiteboard, and pick up the red marker. I say, “I’m going to put a big red star on each step where we had problems during previous launches.”
Starting to make marks on the whiteboard, I explain, “Because a fresh qa environment wasn’t available, we used an old version; because of all the test failures, we made code and environment changes to the qa environment, which never made it back into the Dev or Production environments; and because we never synchronized all the environments, we had the same problems the next time around, too.”
Leaving a trail of red stars, I start marching into Brent’s boxes. “Because we didn’t have correct deployment instructions, it took us five turns to get the packaging and deployment scripts right. This blew up in production because the environment was incorrectly built, which I’ve already brought up.”
Even though I didn’t do it on purpose, by the time I’m done, almost all of William and Brent’s boxes had red stars next to them.
Turning around, I see everyone’s dispirited faces as they take in what I’ve done. Realizing my potential mistake, I hurriedly add, “Look, my goal isn’t to blame anyone or say that we’re doing a crappy job. I’m merely trying to get down on paper exactly what we’re doing and get some objective measures of each step. Let’s fight the problem that’s on the whiteboard as a team and not blame one another, okay?”
Patty says, “You know, this reminds me of something that I’ve seen the plant floor guys use all the time. If one of them walked in, I’m guessing that they’d think we’re building a ‘value stream map.’ Mind if I add a couple of elements?”
I pass the whiteboard marker to her and sit down.
For each of the boxes, she asks how long each of these operations typically takes then jots the number on top of the box. Next, she asks whether this step is typically where work has to wait then draws a triangle before the box, indicating work in process.
Holy crap. To Patty, the similarity between our deployments and a plant line isn’t some academic question. She’s treating our deployment as if it actually was a plant line!
She’s using Lean tools and techniques that the manufacturing folks use to document and improve their processes.
Suddenly, I understand what Erik meant when he talked about the “deployment pipeline.” Even though you can’t see our work like in a manufacturing plant, it’s still a value stream.
I correct myself. It’s our value stream, and I’m confident that we’re on the brink of figuring out how to dramatically increase the flow of work through it.
After Patty finishes recording the durations of the steps, she redraws the boxes, using short labels to describe the process steps. On a separate whiteboard, she writes down two bullet points: “environments” and “deployment.”
Pointing to what she just wrote, she says, “With the current process, two issues keep coming up: At every stage of the deployment process, environments are never available when we need them, and even when they are, there’s considerable rework required to get them all synchronized with one another. Yes?”
Wes snorts, saying, “No reward for stating something that obvious, but you’re right.”
She continues, “The other obvious source of rework and long setup time is in the code packaging process, where it Operations takes what Development checks into version control and then generates the deployment packages. Although Chris and his team do their best to document the code and configurations, something always falls through the cracks, which are only exposed when the code fails to run in the environment after deployment. Correct?”
This time, Wes doesn’t respond right away. Brent beats him, saying, “You’ve nailed it. William can probably relate to these problems: the release instructions are never up-to-date, so we’re always scrambling, trying to futz with it, having to rewrite the installer scripts and install it over and over again…”
“Yep,” William says, nodding adamantly.
“I’d suggest we focus on those two areas, then,” she says, looking at the board and then grabbing her seat again. “Any ideas?”
Brent says, “Maybe William and I can work together to build a deployment run book, to capture all the lessons learned from ou
r mistakes?”
I nod, listening to everyone’s ideas, but none of them seem like the massive breakthrough we need. Erik had described the reduction of setup time for the door stamping process. He seemed to indicate that it was important. But why?
“Having each group cobble an environment together obviously isn’t working. Whatever we do must take us a big step toward this ‘ten deploys a day’ target,” I say. “This implies that we need a significant amount of automation. Brent, what would it take for us to be able to create a common environment creation process, so we can simultaneously build the Dev, qa, and Production environments at the same time, and keep them synchronized?”
“Interesting idea,” Brent says, looking at the board. He stands up and draws three boxes labeled “Dev,” “qa,” and “Production.” And then underneath them, he draws another box labeled “Build Procedure” with arrows into each of the boxes above.
“That’s actually pretty brilliant, Bill,” he says. “If we had a common build procedure, and everyone used these tools to create their environments, the developers would actually be writing code in an environment that at least resembles the Production environment. That alone would be a huge improvement.”
He takes the marker cap out of his mouth. “To build the Phoenix environment, we use a bunch of scripts that we’ve written. With a bit of documentation and cleanup, I bet we could cobble together something usable in a couple of days.”
Turning to Chris, I say, “This seems promising. If we could standardize the environments and get these in daily use by Development, qa, and it Operations, we could eliminate the majority of variance that’s causing so much grief in the deployment process.”